Shipping Roadmap
PromptForge
The public shipping roadmap for PromptForge — an AI prompt engineering studio built the silicon-precise way by Studio by jt. Each phase ships only when it is done right, never before.
Updated July 2026 · Inspired by the /now movement
01The Five Phases
Phase 1 — Verify & Harden
Lock down the core pipeline. Full test coverage, input validation, edge-case handling, and a reproducible build. No unstable paths ship to users.
Phase 2 — Discoverability & Positioning
Ship the marketing surface: SEO-first landing pages, clear positioning, and a precise value narrative. Make PromptForge findable by the right builders.
Phase 3 — Traffic & Activation
Drive qualified traffic and convert it: onboarding that activates, first-run success, and a frictionless path from visitor to power user.
Phase 4 — Growth Loops
Engineer compounding loops: referral, sharing, and content flywheels that turn shipped value into durable, self-sustaining growth.
02Milestone Calendar
| Milestone | Target | Status |
|---|---|---|
| Verify & Harden complete | July 2026 | In progress |
| Discoverability & Positioning live | August 2026 | Planned |
| Traffic & Activation tuned | September 2026 | Planned |
| Growth Loops engaged | Q4 2026 | Planned |
03How We Ship
Publish Gate
Nothing ships without Jordan's review. Every phase, every release, and every copy change is signed off before it reaches users. Precision over velocity, always.
No Dark Patterns
This product will never use dark patterns. No manipulative dark-ui, no fake urgency, no forced continuity, no hidden cancellations, no manufactured scarcity. Builders deserve software that respects them. If something feels coercive, it is a bug — report it.
This roadmap is part of the /now movement started by Derek Sivers. PromptForge is one of several products shipped by Studio by jt.